| NAME OF PROJECT: | Top Aberdeen Water Supply |
| LOCATION OF PROJECT: | St. Elizabeth |
| SCOPE OF PROJECT: | · Build pumping station
· Supply and install transmission and distribution pipelines · Supply and install solar pumping system · Construction of 03,000-gallon water storage tank |
| ACTUAL COST (to date): | J$95,876,613.11 |
| POPULATION: | Approx. 1,600 |
| MEMBER OF PARLIAMENT: | Hon. Delroy Sloley |
| OWNERS/OPERATORS: |
National Water Commission |