| NAME OF PROJECT: | Platfield Water Supply |
| LOCATION OF PROJECT: | St. Mary |
| SCOPE OF PROJECT:
|
– Design & Build Intake – DamWall
– Design & Build Loading Bay for Raw Water Catchment – Design & Build Chlorination System – Design, Supply & Install Transmission Pipeline from Source to Platfield – Design, Supply & Install Distribution Pipeline from Platfield to residents & Surrounding communities- Mt. Vernon & Clarks Town
|
| ACTUAL COST (to date): | J$93,103,204.17 |
| POPULATION: | 4,500 |
| MEMBER OF PARLIAMENT: | Dr. Norman Dunn |
| OWNERS/OPERATORS: | National Water Commission |