|
|
|
| NAME OF PROJECT:
|
Maybole Water Supply Upgrade |
| LOCATION OF PROJECT:
|
St. Elizabeth |
| SCOPE OF PROJECT:
|
|
|
ACTUAL COST:
|
$48,138,682.32M |
|
POPULATION:
|
N/A |

Transmission pipeline

14,000 US Gallon Tank

Installation a solar panel
|
|
|
| NAME OF PROJECT:
|
Maybole Water Supply Upgrade |
| LOCATION OF PROJECT:
|
St. Elizabeth |
| SCOPE OF PROJECT:
|
|
|
ACTUAL COST:
|
$48,138,682.32M |
|
POPULATION:
|
N/A |

Transmission pipeline

14,000 US Gallon Tank

Installation a solar panel